Recently, Anhui issued the “Anhui Province Key Project Investment Plan for 2022”. 8,897 provincial key projects were set throughout the year, with an annual planned investment of 165.724 billion yuan. Among them, 5,642 projects have been built and 3,255 projects have been planned. 1,752 projects were completed throughout the year. Among them, Fuyang Huayang Electric Factory Phase II 2×660MW ultra-super-level coal-fired machine project, Panji Electric Factory Phase I 2×660MW ultra-super-level coal-fired machine project, Datang Chuzhou Electric Factory 2*660MW machine project, Huainan Luoneng Electric No. 5 machine unit comprehensive upgrade reform, Lixin County agricultural bio-quality hot power project and other hydroelectric projects, Jinzhai pumped storage power station in Anhui, etc. The list is as follows:
Anhui Province 2022 Key Project Investment Plan
1. Manila escortHefei City
Continuous construction project
The sixth generation flexible active matrix organic light-emitting display device (AMOLED) production line project
Annual production 20GWh major standard core project
Hefei Biyadi Automobile and Parts Factory Construction Project
Gaxin High-efficiency Photovoltaic Component Production Project (Phase I)
TFT-LCD backlight source and optical data production project
Shuangjie Electrical Headquarters and Smart Network High-end Equipment Base Project
Third-generation Power Semiconductor (Silicon Carbide) Production Project
National Electrical Appliance Supporting Production Project
Smart Equipment and Industrial Automation Complete Sets of Equipment R&D and Intermediate Production Base
Huaxia Land Development Feidong City Rong Conference Project
Zhifeilongkoma Biopharmaceutical Park
The world’s leading ultra-wide polarizer production base project (Phase I) PMMA and overview coating project
New power passenger car body parts construction project
Annual production 3GWH32135 round column battery project
Jinghe second factory and supporting projects
Major national car Annual production of 30,000 tons of ternary positive data items
3D curved glass panels, wearable equipment advanced data panels and car-load glass panel production projects
Han soft ultra-thin flexible glass substrate projects
Intelligent storage robot projects
New data items
Overall production of 100,000 tons of slurry base alloys
Beijing-Yehuan transfer focus parts projects
Hechao Industry New City 5G Demonstration Park
New Dynamic Power Generation Complete Set Equipment Manufacturing Base Phase II Project
Hefei High-tech Zone Regeneration Resources Circulation Eco-link Project
The 10.5th Generation Thin Film Crystal Tube Liquid Crystal Display (TFT-LCD) Production Project
High-end IT Display Screen Production Project
Baolong Annual Production 26.8 million Vehicle Sensors
>Steel Battery Bottom Data Project
Yang Optoelectronic Power Co., Ltd. Annual Production 2GW Smart Photovoltaic Power Development System Research and Development Project
Haichen Pharmaceutical Feidong Production Base Project
Anti-Protein and Protein Drug Production Base Project
Outhentic Hirsch Foaming Equipment and Mold Production Project
Chaohu Jinchen Medical Park Phase I Project
Sixiang Aluminum Round Column Battery Case Production Project
Lixiang Power Steel Battery Plate Production Project
New Display Supporting High-end Electronic Data Production Base Project
Waste Old Steel Ion Battery Acceptance and Receiving Comprehensive Application Project
Beike Headquarters and OLED High-end Equipment Manufacturing Project
Zhenping Semiconductor Equipment and New Dynamic Equipment Manufacturing Project
Full-stick integrated platform Project
Teached Medical Technology Ankang Medical Equipment Base Project
Jerryda Pharmaceutical Biology New drug research and development and production project (Tino Biologics)
Jingdongfang MiniLED (Hefei) production line project
Anhui Wanbang Medical Technology Co., Ltd. Drug research and development and pharmaceutical agency power engineering
Jockey ZF Heqian Intelligent High-end Industrial Vehicle Transmission System Production Base Objective
Yinguang Medical External Clinic Tester Research and Development Production and Headquarters Base Project
Complete Translation Intelligent Color Selection and Split Equipment Production Project
High-tight Semiconductor Lead Frame and AMOLED Steamer High-precision Metal Mask (Phase I) Project
Construction project between the Ming PV system manufacturing base and new power data operation
Integrated circuit key technology data project
Hesheng high-end intelligent integrated data production line expansion project
Power equipment research and development production base project
Over the annual production of 50 million sets of electronics Secure structure project
Atropine sulfate eye drop liquid industrialization and R&D project
Jinjian performance-based sugar products and biological products
Choke Electronic Road Condition Intelligent Testing Base Project
New Power Automotive and Control System Production ProjectSugar daddyProject
Worf Permanent Magnet Transportation Research and Development and Industry Project
Zhengyou IC Plate Project
Anhui Haisu Technology Stable Isotope C13 Production Project
College Network IntelligenceConstruction project of the energy-final production base
Hefei Sunkang New Power Production Machinery and Accessories Production Project
Green City has an annual production of 300,000 new power-powered automobile battery accessories and gearbox processing construction project
Deep Blue Medical Viral Diseases Clinical examination of external diagnostic tester product base project
Kowel Phase II Production Base Project
Solid, paste preparation and production supporting engineering construction project
Optical-electrical analysis production base project
PhiliSugar babyHua TFT-LCD and Semiconductor Photomask Version Tight Processing Project
Tianyuan Dike Hefei R&D Base Phase II Project
Hefei Henglei Police Automatic Installation Manufacturing Project
Yuanfeng Power Sea Fluid Power Station Project
Construction project for the production line of engineering equipment parts in the mainland
Annual production of 3 million Taiwanese medical equipment equipment projects
Yufeng Intelligent Logistics Storage Robot Project
The 6th generation touch screen production line Mini-LED backlight backplane project
Kangno Pharmaceutical Headquarters and Production Base Project
Innovative Pharmaceutical Industry Demonstration Base Phase II Project
Ocean Production 10,000 Tons of Water-based Coatings and 5,000 Tons of Organic Chemicals and Distribution Operation Project
Analysis Tester Construction Project
Selectrolytic Ion Electrolytic Pool production project
Annual production of 250 million flasks, external test agent production and medical equipment sales project
Hand Technology Park project
Annual production of 20 million integrated electronic control board construction project
Anhui Boma Motor Intelligent Installation Production base project
Electric glass and 3D curved glass production project
Hengxinji smart home appliance supporting sensors and wire production project
Annual production line project of 2,000 tons of ferrous iron boron new data production line project
Big Yu Raw Materials Pharmacy Production Project Phase I
Home Electrical Panel Production, Servo Electric Machinery and Mold Processing, R&D and Manufacturing
Only 200,000 Taiwanese Household Appliances, 1 million Taiwanese Medical Equipment Projects
Water-based Coating Adhesives and Lithography Coating Production Project
Thin Film Data Application Test and testing projects
Zhujiang Rongfeng’s annual production of 200,000 tons of road conditions and 5G signal tower accessories production projects
10 million electronic tightening components projects
Hefei Kaili’s annual production of 25,000 Taiwan New Power Automobile High-speed Electric Grip Project
CNC equipment and robotic automatic hardware and software application systems
China Anhui High Definition Scanning Service Equipment Manufacturing Project
High-function full-screen production project
Annual production line project of 8,000 tons of high-function permanent magnet oxygen magnetic tile production line project
p>
Intelligent communication equipment and supporting product production project
Boder intelligent air ampulizer production project
Construction project
Over the annual production of 300,000 high-end hydraulic components
Earth green assembly building headquarters industry base
Major wheel tire phase 4
Yuan Intelligent Intelligent Manufacturing Park Phase I
Daily Reform project for the whole moving and upgrading of 6,000 tons of clinker new dry-process cement production line
Central South Hi-Tech Industrial Real Estate Project
Shushan Chengtou Environmental Economics Park Project
Zhibang Home Furnishing Supporting Production Park Project
Annual production of 100,000 tons of H-steel and 3.6 TC: